Monday - Friday 8:30 am - 4:00 pm Tel: 250-245-6400 Fax: 250-245-6411 Email: info@ladysmith.ca
Rock blasting is scheduled to occur on Friday afternoon in the south end outside of the Town boundary.
The activity is on Crown land in the hills above Ladysmith and is related to the construction of a logging road
Future rock blasting could continue as materials are needed for the road.
For more background and a list of FAQs about this project visit our website: https://www.ladysmith.ca/home/2019/10/30/stz'uminus-first-nation-begin-upgrades-to-reactivate-logging-road-in-town-boundary